Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Non-specific |
Tags: | None |
Date time: | 3.23pm, Thursday 6th September, 2012 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | garydawes |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Hebburn |
Green Lane, South Shields.
Entrance onto the West Harton Mineral Line Cycleway heading south
Why dropped kerbs were not installed when the level crossing & rail lines removed is odd.
Comments reflect the views of the original submitter only.