Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 3.12pm, Saturday 8th September, 2012 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | garydawes |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Hebburn |
Tyne dock - Simonside cycleway. If heading east then turn right onto the road.
Comments reflect the views of the original submitter only.